Here is a short but effective preventative maintenance schedule from Presto Lifts. Setting up a good maintenance program is the key to how well and how long your Presto Lift works for you. Regular maintenance helps prevent costly repairs and work slow down.
Weekly
- Inspect Leg Rollers
- Inspect Pivot Bolts, Pins & Bushings For Wear, Missing, Or Broken Parts
- Inspect Hydraulic Lines For Damage Or Leakage
- Inspect Wiring For Damage
- Inspect Pre-Cautionary Labeling
Monthly
- Oil/WD-40 To Non-Greased Pivot Points And Rollers
- Check For Any Appearance Of Hydraulic Fluid
Six Months Or 500 Hrs. Of Operation
- Inspect All Fittings, Hoses, & Connections
- Repair As Needed
- Inspect Cylinder Return Line
- Excess Fluid Indicates Need To Repack Cylinder
- Disassemble The Down Flow Valve. Clean with Compressed Air
- Change Oil In Reservoir
- Clean Reservoir Screen & Vent Cap
- Replace Return Line Filter Element
Comments are closed.