Tag Archives: Future Installations

Cogan Mezzanine Being Installed at a Graphics Company North of Boston

This Cogan Mezzanine is being installed in a space with a previously installed mezzanine on several sides. The deck height needs to be matched and the deck from the new structure needs to run continuously onto the old structure.

  • Columns on the perimeter of the new mezzanine structure need to be placed close to the existing mezzanine’s columns to minimize the impact to traffic patterns.
  • The new structure needs to be designed to miss the existing building support columns.
  • The new structure needs to extend to the existing structure to allow the new deck to meet the existing deck.

This gallery shows some of the results from challenges that were encountered and designed into the new structure.

Special thanks to Preferred Equipment Resource for going with a Cogan Mezzanine for this job and the expert installation job from Future Installations.